Apartments in Distrito Nacional | 3 bedroom Apartment in Los Prados/ Delivery April 2025
Location
Distrito Nacional
Published
18/03/2024
Price/m² of construction
$1,677
Balcony/Terrance
terrace
Floor Number
5
Benefits
Maids Quarters
24 hour Security
Power Generator
Details
Features:
165.24m2 net
3.61m2 locker
23.07m3 Terrace
3 Rooms
2.5 Bathrooms
Walk in closet
2 Parks
Room
Kitchen
Dining
Wash
Service room with your bathroom
General characteristics of the Project:
The apartments that make up our project consist of the following finishes and common features: precious oak wood (door and closet), porcelain floors, imported Spanish modular kitchen, common gas with meter, lokers assigned to the apartments of 2 and 3 rooms, electric floor, elevator, pre-installation for A/A, cistern, pump case and well. This project has 6 levels, the 1st level of parks, 4 levels of apartments and finally the 6th level belongs to the social area, designed under the standards of quality and demand for our customers.
Payment methods:
Separation of USD$1,000.00.
10% to the formalization of the contract. (30 days after booking)
25% during the constructive process.
65% against delivery.
Date Delivery time: April 2025
165.24m2 net
3.61m2 locker
23.07m3 Terrace
3 Rooms
2.5 Bathrooms
Walk in closet
2 Parks
Room
Kitchen
Dining
Wash
Service room with your bathroom
General characteristics of the Project:
The apartments that make up our project consist of the following finishes and common features: precious oak wood (door and closet), porcelain floors, imported Spanish modular kitchen, common gas with meter, lokers assigned to the apartments of 2 and 3 rooms, electric floor, elevator, pre-installation for A/A, cistern, pump case and well. This project has 6 levels, the 1st level of parks, 4 levels of apartments and finally the 6th level belongs to the social area, designed under the standards of quality and demand for our customers.
Payment methods:
Separation of USD$1,000.00.
10% to the formalization of the contract. (30 days after booking)
25% during the constructive process.
65% against delivery.
Date Delivery time: April 2025